Ulm Minster, Ulm/Donau, Germany

Informācija par projektu

Atrašanās vieta: Ulm, Vācija

  • Renovation of the choir (29 m long, 15 m wide and 26 m high), the choir tower (86 m high) and the approx. 161 m high main tower of Ulm Minster.

Prasības

  • Three-dimensional, flexibly adaptable working scaffolds for the adaptation of recesses and roundings in the vaulted ceiling in the choir.
  • Adaptation and renovation of the wooden choir stalls, the altar and the choir organ.
  • Improper anchorages onto historic building structure.
  • 7 m high heavy-duty platform for the temporary storage of stones due to limited storage area in and around the Minster.
  • High live load of 15 kN/m².
  • South Minster entrance and a construction container on the façade to be taken into account.

Klients

Münsterbauhütte [Minster site office] Ulm

Scaffolding company

Mack GmbH, Nersingen

3D surveying support

Moselcopter GmbH

Klienta ieguvumi

  • Short implementation phase from the planning up to the implementation.
  • Avoiding damage to re-usable construction materials in the scaffold assembly through prior application of 3D scaffold planning and the BIM methodology.
  • Simple lattice girder assembly due to light, manageable ULS Flex system parts.
  • Flexible adaptation to the complex geometry of the choir in the metric system grid.
  • Short transport routes and on-schedule supply of materials due to regional proximity.
  • Fast assembly and high security due to the application of system components.

PERI risinājumi

  • 3D laser scanning to measure the interior and transfer of the 3D building model into PERI CAD as the basis for the scaffold planning.
  • The 13,000 m³ PERI UP birdcage scaffold with no anchorage in the choir of Ulm Minster – to protect the historic building structure.
  • Safe, parallel working on the choir stalls and the choir vault through tiered working surfaces and access possibilities using PERI UP Flex.
  • Access and vertical material transport via hoist and a stair tower integrated in the scaffolding construction.
  • Modular ULS Flex lattice girder for bridging – for instance of the Minster entrance and construction container.
  • 71 m high work and safety scaffold with integrated 7 m high heavy-duty platform.

Izmantotās PERI sistēmas